Tunnel Pigeon Waste Removal Case Study

When pigeon waste was needed to be removed and cleaned off high edges of an underground tunnel, NLR was called in. A scissor lift solution was undertaken in order to clean places otherwise hard to reach.

Project Highlights

95

meters of tunnel sporadically cleaned.

4

nights to clean 2 exits

2x

Petrol driven pressure pumps

1x

Waste extraction truck, to extract and dispose of waste safely.

In an underground tunnel system, in two particular exits, pigeons frequented the high ledges of the area. As a result, the following elements were affected:

Concrete Walls

Concrete barricades

Road

Footpaths

Pipes

Light/Supports

Results

All workers were site inducted and worked in conjunction with traffic control to minimise downtime of roads. The work was undertaken during the nights between 9 pm-4 am and was completed in 4 nights. Biohazardous material was removed using pressure hosing and was safe with a waste disposal truck service. Overall, the client was happy with the results.